Full construction documentation that contractors can actually build from — developed by people who've spent 20 years on the building side. Serving Toronto and the entire GTA.
Permit drawings get you approval. Construction drawings get you built — on budget, without a stack of change orders. The difference between the two is detail: sections that resolve real conditions, schedules that match procurable products, dimensions a site crew can pull a tape to.
Most drafting firms have never priced a job or managed a trade. We have — for over twenty years. Our construction sets are developed from the builder's side of the table, which means fewer RFIs, fewer surprises behind the drywall, and a tender package that gets you real, comparable prices from contractors.
We produce full construction documentation for commercial interiors and buildings: detailed plans, sections and details, finish and door schedules, coordinated mechanical and electrical layouts, and specifications appropriate to the project's scale.
Every drawing we produce is backed by 20+ years of hands-on commercial construction across the GTA. We know what plan examiners look for because we've stood on both sides of the process — and we know what contractors need because we've been the contractor. That combination is why our clients' applications move.
Free consultation. Straight answers. A clear quote within 24 hours.
Get a Free Quote ↗ ☎ (416) 555-1234Permit drawings show code compliance — the minimum the city needs. Construction drawings add the detail a contractor needs to price and build accurately. We can produce either, but recommend full construction sets for any project over a modest scope.
Consistently. Vague drawings produce padded bids and change orders. Detailed, buildable drawings produce tight, comparable bids and far fewer surprises — the drawing fee typically pays for itself several times over.
Yes, if you want us to — responding to contractor questions, reviewing shop drawings, and attending site as needed.
Free consultation. Clear quote within 24 hours.